|
Product Detail :
|
Construction of 01 No Important Bridge and 04 Nos. of Major Bridges including
formation upto 300 meter on each approaches in connection with "Construction of
4th line between sections Durg-Rajnandgaon(31.0Km) and Sarona-
Bhilai(17.30Km)" in the State of Chhattisgarh on EPC Mode.
|
| Tender Detail : |
Construction of 01 No Important Bridge and 04 Nos. of Major Bridges including
formation upto 300 meter on each approaches in connection with "Construction of
4th line between sections Durg-Rajnandgaon(31.0Km) and Sarona-
Bhilai(17.30Km)" in the State of Chhattisgarh on EPC Mode. |