Product Detail :
|
Erection of temporary stopping by old reject conveyor belt in 39LN and 34LN LHCM panel (ii) Preparation of intermediate sump for proper dewatering. (iii) Shifting of pump along with pipe line. (iv) Laying of pipe etc. in dep. Panel 39LN and 34LN (v) Cleaning and removal of blasted materials at seam A in Kurja UG Mine.
|
Tender Detail : |
Erection of Temporary Stopping By Old Reject Conveyor Belt in 39ln and 34ln Lhcm Panel (ii) Preparation of Intermediate Sump for Proper Dewatering. (iii) Shifting of Pump Along with Pipe Line. (iv) Laying of Pipe Etc. in Dep. Panel 39ln and 34ln #*. Erection of Temporary Stopping By Old Reject Conveyor Belt in 39ln and 34ln Lhcm Panel (ii) Preparation of Intermediate Sump for Proper Dewatering. (iii) Shifting of Pump Along with Pipe Line. (iv) Laying of Pipe Etc. in Dep. Panel 39ln and 34ln |