Product Detail :
|
Reconditioning of 2 no Bucket/Dipper assembly Of 182M BEML Bucyrus make Electric Rope Shovel. Mechanised excavation, loading, transportation and unloading of 5.00 (Five) lakhs tones of iron ore fines from Dep-10/11A fine ore stockpile to fine ore dump (FOD) through NMDC weigh bridge at an average lead distance of 3.5-4.0 kms (one way approx) or as directed by Engineer In-Charge. De-silting of Slime from check bunds from Downhill, magazine pump house & Gully nallah pick up weir including mise works for improving water supply at Dep-5. Hiring of 1 no. Excavator or Poclain EX-210 or equivalent on hourly basis at FOD area. Dismantling of Old Type IVDS/217-296, 10 blocks quarters (Ilnd Phase) at BIOM Bacheli Complex.
|